Pool builders by city
Pool builders serving Davie. What slows a Davie pool is rarely the pool: it is the easement behind the house, the drainage district that controls it, and a survey that has to be under two years old. Start with the shortlist, then read what you are personally on the hook for.
4 listings here 4 based here
These pool builders are not based in Davie and don't emphasize their services here, but they've shown they work here, too — so check them out, too!
Tell us what your dream pool is all about, and where do you want it. We'll do our best to find a professional pool builder for your project.
A handful of builders are based in the town itself, and a handful more work Davie out of the rest of Broward. That is a short list for a town of a hundred thousand people, and it is worth knowing what those builders are walking into before you start calling.
Type "pool builders near me" from a Davie address and half of what comes back sits in Plantation, Cooper City or Southwest Ranches. A company two miles over the line can build here perfectly well. The permit is still Davie's, filed on Davie's portal and reviewed against Broward's amendments, so the question worth asking is not where the office is but how many jobs they have closed out with this town.
Davie's eastern side is mostly platted subdivision: houses on lots you can walk the perimeter of in a minute, a good number of them backing a lake or a canal that belongs to a drainage district rather than to the homeowner. Its western side is acreage. Ranch parcels, paddocks, and an unpaved trail network the town has been extending since 1986 for riders and hikers.
The median home here was built in 1989, which puts the town between the older coastal cities and the newer western suburbs. Two kinds of work follow from that: first pools going into yards that never had one, and resurfacing on shells now thirty-odd years old and onto their second finish.
Ask a builder which end of town most of their Davie work sits in. An acre with a paddock behind it is a different job from a quarter-acre backing a district lake, and what constrains each one is different. On the acre it is access and haul distance. On the lake lot it is the easement.
The permit is issued by the town, not the county. The Building Division works a four-day week, Monday to Thursday, and since January 2026 everything arrives through the town's online submittal portal, with plans uploaded to ProjectDox after an emailed invitation and no paper taken at the counter. Walk-throughs survive in a narrow window: Wednesday mornings, 8:00 to 10:30.
One backyard pool takes three separate permit applications, structural, electrical and plumbing, and passes three review stops on the way through: planning and zoning, structural, and engineering. All of it is read against Broward's own amendments to the Florida Building Code, written by the county's Board of Rules and Appeals rather than by the state.
Most homeowners have never heard of the third body that has to sign off on their pool. The town's own pool checklist asks for the applicable drainage district approvals whenever the work sits in a drainage easement or near water, and it names three districts by name.
These are independent special districts with their own boards, their own fees and their own inspectors. The South Broward Drainage District publishes the clearest account of what that involves: a fifty-dollar application, a complete copy of the warranty deed, a signed and sealed survey with every page attached, and a site plan carrying grades for the top of the proposed deck and for the ground at the edge of the easement. Then a physical inspection of the property before the application is even processed, which the district puts at one to two weeks.
Central Broward Water Control District, which keeps its offices on Stirling Road in Davie, states its position plainly: nothing goes up inside a district easement without approval from the town and the district both.
| District | Where it sits | What it wants for a pool |
|---|---|---|
| Central Broward Water Control District | Offices on Stirling Road, in Davie | Written approval before anything is built in a district easement |
| South Broward Drainage District | Southwest Broward, east to University Drive and north to the Griffin Road canal | A pool review on a waterfront lot: deed, sealed survey, site plan with grades, fifty dollars, site visit |
| Tindall Hammock | About 780 acres of central Broward; the board meets in Davie | The same idea on a much smaller footprint |
Start with the land you do not control. On a lot backing district water there is a maintenance easement between the deck and the waterline, and a pool is not permitted to encroach into it. If a deck or a fence needs to reach in, that is a separate permit from the district rather than a note on the plan.
Utility easements work differently. The town will consider work inside one, but the checklist asks for an executed hold harmless utility easement agreement first. Read what that is before you sign it, because agreements of this kind put the cost of tearing out and rebuilding your own deck on you if the easement ever has to be opened up.
Setbacks are the part nobody can answer for you generically, since Davie carries an unusual spread of zoning districts and a ranch parcel is not measured like a quarter-acre in a subdivision. Planning and Zoning will confirm yours against your survey on 954-797-1103, and that call belongs before a designer draws anything rather than after.

Most of the permit set is your builder's work. Four things are not, and they are the ones that move a start date.
The town wants an addendum form signed and notarized by the contractor and the owner both, which means you, in front of a notary. It wants proof of ownership pulled from the Broward County Property Appraiser. A notice of commencement has to be recorded. And it wants a signed and sealed survey: if yours is more than two years old and nothing on the property has changed, an executed survey affidavit will carry it.
Two smaller ones catch people out. A tree affidavit, if the work does not conflict with existing trees, and a tree removal permit if it does. Plus a diagram showing how the work gets screened by planting.
The order matters more than the list:
A design drawn before anyone checked which district holds the lot is a design that gets redrawn. The district's own application form carries a box for revisions, which tells you how often it goes that way.

Two quotes on the same street can sit thousands apart, and on a lot here the gap almost always traces back to the same short list:
Access is the one people underestimate on the ranch parcels. A long run from the street to the back of the property means more days of plant hire and more truck movements, and neither arrives as a line a homeowner thinks to question.
Deck area is the one they underestimate on the lake lots, since it is the number the town's engineering review and the district are both looking at, and enlarging it late is how a cleared review gets reopened. The sealed plan set has to carry soil conditions too, either a geotechnical report or a soil statement, so what is under the yard gets priced before the dig instead of discovered during it.
Here is the one thing we would tell a friend buying in Davie. Find out which drainage district your lot sits in before you talk to a designer, not after. It sounds administrative. It decides how much of the backyard is yours to build in, how long the approval takes, and whether the pool you have been sketching fits at all.
The other one is about interviewing. The useful question is not how many pools a builder has put in the ground, it is how many they have taken through a town review and a district sign-off. Those are different skills, and the second is where the calendar goes.
Lot size does most of the deciding.
On the acreage parcels the deck and the patio are the real project. There is room for them, and a pool sized without them ends up marooned in the middle of a lawn. A spa earns its place for the same reason, and a sun shelf is the part of the design families with young children use most.
| Feature | On an acre parcel | On a subdivision lot |
|---|---|---|
| Deck and patio | The real project. Size the pool around it | Capped by what the district will review |
| Screen cage | A wider span to engineer and to pay for | First decision, since it sets the deck |
| Spa | Reads as a second room outdoors | Buys back space a small shell cannot give |
| Infinity edge | No grade change to work with | The view being bought is a stormwater canal |
On the subdivision lots the order flips. The cage comes first, since in Broward it is an engineered structure drawn for wind load rather than something added on later, and it sets the deck size, which is the number the district cares about. On an acre with nothing behind it, lighting is the difference between a pool you use after dark and one you can merely see. Heating earns its keep on a screened pool that loses the afternoon sun, and a saltwater system is an easier call this far inland, where the pad is not fighting salt air from outside as well.
Shell type is where access gets a vote: between gunite and fiberglass, a backyard you can barely get a machine into changes the arithmetic more than taste does. The one thing we would not build here is an infinity edge, since the lots that tempt people into one are the lots backing a district lake, which are exactly the lots where the last stretch of yard belongs to somebody else and the grades are already under review.
Davie's rules stop at the town line. Fort Lauderdale, on its northeast side, puts most of its pool lots on tidal water, so the thing at the back of the yard is a seawall and not a district easement. Oakland Park trades acreage for small platted lots, and there access is the whole conversation. Pompano Beach is coastal Broward with a high water table and a city that wants its own geotechnical report filed with the application. Cross into Miami and the amendments change with the county, because Miami-Dade writes its own and none of Broward's desks are involved.
If the work sits in a drainage easement or near water, yes. The town's pool checklist asks for the applicable drainage district approval and names three: Central Broward Water Control District, South Broward Drainage District and Tindall Hammock. Which one holds your lot depends on where in the town it is, and it is worth settling before anyone draws a plan.
The town wants a signed and sealed survey. If yours is more than two years old you can carry it with an executed survey affidavit confirming nothing on the property has changed. If something has changed — a shed, a fence, an addition — you need a new one, and ordering that late is one of the more common reasons a Davie job sits still before it starts.
No. Since January 2026 the Town of Davie takes permit applications through its online submittal portal, with plans uploaded to ProjectDox after an emailed invitation. In-person walk-throughs still run in a window on Wednesday mornings, 8:00 to 10:30, and the Building Division works Monday to Thursday.
Not into a drainage district easement. A pool is not permitted to encroach there, and a deck or fence that reaches in needs its own permit from the district. A utility easement is different: the town will consider work inside one, with an executed hold harmless utility easement agreement, which puts the cost of removing and rebuilding that work on you if the easement is ever opened up.
The checklist asks for a complete set sealed by an engineer, including soil conditions — a geotechnical report or a soil statement. Broward's water table sits close to the surface, so what is under the yard changes how the shell is engineered and how the hole is held open while it goes in.
An addendum form signed and notarized by the contractor and the owner both, proof of ownership from the Broward County Property Appraiser, and a recorded notice of commencement. If you are permitting it as an owner builder, an Owner Builder Disclosure Statement goes in as well.
Access first: how a machine reaches the backyard and how far spoil has to travel, which matters more on an acre parcel than most people expect. Then deck size, the cage spec, what the soil report turns up, and whether a district review is sitting on the calendar. Ask each builder to price the access and the district sign-off as their own lines, so you can see where the gap between two quotes actually sits.
Because the local pack ranks on proximity, and Davie shares long borders with Plantation, Cooper City, Sunrise, Southwest Ranches and Fort Lauderdale, so a company two miles away sits in another town. That is fine for the build. Check the company on the DBPR license lookup for an active CPC, or a CBC whose scope covers pools, and ask how many jobs they have closed out with Davie.
If you didn't find a pool builder for your Davie passion project here, check out the neighbours: professional pool builders usually don't mind travelling a few miles to help new customers with the most exciting projects.